After a well is constructed and developed, it should be tested for its yield and the corresponding drawdown. The equipments required for conducting an yield test are: (i) A test pumping unit consisting of a submersible pump (with 3-phase motor) and a diesel generating set (since power may not be available at the time of […]
How to Test the Yield of a Well? | Geography
Article shared by : 
Selection of a Site for a Well | Hydrogeology
Article shared by : 
The factors to be carefully studied before selecting a site for sinking a well are: (i) Topography: The valley regions are more favourable than the slopes and the top of hill rocks. (ii) Climate: Maximum temperature, the annual rainfall region, intensity of sunlight and humidity are of considerable value. Semi-arid zones are more favourable than […]